top of page

STOP THE HIGHWAY EXPANSION • GET INVOLVED NOW • PROTECT OUR COMMUNITY • NO ROUTE 23 CONNECT

logo

Facebook Posts & Documentation

Stay up to date with our latest Facebook posts and the supporting documentation behind them.

Our most recent update, “Senator Reineke Speaks” (posted 03.19.2026), includes a breakdown of his recent public comments along with sourced materials for deeper context.

Picture For Website 11.png

Document Library

We’ve gathered a wide range of information and brought it all together in one easy to access place. Here you’ll find key documents, research, and communications related to our opposition to a new bypass and our support for practical improvements to the existing US 23. We will continue adding new documents as we obtain them and release them to the public.

 

This includes:

  • Archived informational posts from our Facebook group

  • ODOT documents, including the US 23 - I‑71 Connector Feasibility Study and Route 23 Connect

  • Formal bypass opposition statements and resolutions supporting improvements to the existing US 23

 

Our goal is to provide clear, accessible information so the public can stay informed and engaged. Check back often for updates.

What Led to the New
US 23  I-71 Feasibility Study

This overview explains how the current proposal for a US 23 I-71 bypass came about. It outlines ODOT’s earlier studies, which found that improving the existing US 23 corridor was the most effective and affordable option for connecting Toledo and Columbus. Despite those findings, state lawmakers later required ODOT and the Ohio Turnpike and Infrastructure Commission to study new bypass routes, leading to the project now under review. The summary also notes that many local officials in Delaware, Marion, and Morrow Counties have raised concerns about the bypass. This background helps readers understand why the project is being studied again and how it differs from ODOT’s original recommendations.

Picture For Website 8.png
Picture For Website 9.png
Route 23 Connect 
Study
 
Picture For Website 6.png

The Route 23 Connect Study focuses on identifying improvements between I-270 and Waldo to ensure safer, more efficient travel and better travel time reliability for through traffic. The findings will guide an action plan outlining specific project concepts of varying size and scope. 

US 23 I-71 Connector Feasibility Study
Picture For Website 6.png

This study will examine the feasibility of establishing a new freeway connection between US Route 23 and Interstate 71 north of Columbus as directed by Section 755.60 of House Bill 54 (further amended by House Bill 96) of Ohio’s FY 2026-2027 Transportation Budget Act.

Strategic Transportation & Development Analysis
 
Picture For Website 6.png

A statewide study to examine demographics, economic development, transportation systems, and travel needs over the next several decades.

I-73
Study


 
Picture For Website 6.png

A comprehensive feasibility study on the potential development of an interstate corridor, running primarily along US 23, extending from Toledo to Chesapeake, Ohio.

bottom of page